|
WHY INVEST IN THERMOCURE
Can you guarantee that your concrete testing complies
with ASTM standards? If it doesn’t, the results could be devastating:
thousands of dollars wasted on rework, retesting, even lawsuits and
fines..
To comply, you have to control temperature during
the initial curing of test cylinders. Yet none of the common methods—wet
burlap, sand pits, plastic bags—are certain to keep temperatures
within the specified limits [link to Technical Handbook section,
page on ASTM C 31 standard].
Thermocure II makes it happen—with thermostatic
controls to keep temperature constant automatically. By using Thermocure
II on your jobsite, you protect yourself from noncompliant tests.
As a result, you:
* Reduce or eliminate
liability
* Enjoy peace of mind
* Promote your project’s success

The National Ready
Mixed Concrete
Association has identified the improper handling
and curing of test cylinders as its #1
technical problem.
Some suppliers spend huge amounts
to ensure good test results via alternative means. They could have
achieved the same results—at far lower cost—by running
ASTM-compliant tests.
By eliminating common sources of cost
overruns, Thermocure II can pay for itself many times over.
Construction Innovations | Thermocure Concrete Testing, Welded
Wire Reinforcement, Corrosion Engineering, Segmental Bridges
|